Study workflow

From site audit to fabrication drawings

01 Site audit

We survey the site, the material and the constraints before any drawing begins.

02 Kinematic analysis

We model movement, load paths and flow rates to define the equipment's operating behaviour.

03 3D modelling

Our 3D models check fit, clearances and structural integration before fabrication.

04 Fabrication drawings

Validated drawings pass directly to the production team in Landivisiau.

Calculation and method

Calculation rigour applied to each handling challenge

Each configuration begins with the granulometry, density and site constraints of the material. Our engineers translate these into operating diagrams that show how the installation will run.

Study data moves directly to production, so the design intent carries through to the finished equipment.

Custom technical solutions, tailored precisely to the material and the site.

CASTEL design office